Actualities
News
Our company CZ MONT, was included in the prestigious competition DIAMONDS of
SLOVAKIAN BUSINESS. The third annual ranking "Diamonds of Slovakian
business' evaluate dynamics of growth within Slovak companies. Event was
organized by business magazine Profit and Enterprise Investors, and was held
20 September the 2011 in Kempinski hotel Bratislava. The competition
includes companies which were founded before 2007, reaching annual sales of
2 to 20 million Euros with a healthy degree of indebtedness and
profitable performance over the past two years. Companies were evaluated
according to dynamics and turnover by performance in the years 2008 to
2010. CZ MONT, s.r.o. occupied 22nd place in the Slovakian nationwide ranking
(more than 900 companies were investigated).
The Actual Supporting Projects being executed by CZ MONT, s.r.o. :
| Contract: |
Power Station Belchatow, Poland |
| Duration: |
1/2012–12/2012 |
| Subject: |
Assembly and disassembly of membrane walls up hopper, including displaced
8 pcs powder burners – about 5,500 of pressure joints, disassembly
and exchange of bandages about 94 000 kg – Boiler K7,
K8 400MW |
| Purchaser: |
STEINMULLER |
| Contract: |
TEKO Košice, Slovakia |
| Duration: |
6/2011–3/2012 |
| Subject: |
Assembly of the granulation of the boiler to burn coal with the following
parameters: rated power boiler 130 t / h, nominal steam temperature of
540 C, nominal pressure superheated steam at 13.64 MPa, the total
weight of pressure and non-pressure parts of 2000 tonnes |
| Purchaser: |
IEG |
| Contract: |
Moorburg, Germany |
| Duration: |
2012 |
| Subject: |
Welding and assembly works on installation of supercritical boiler
800 MW |
| Purchaser: |
HM Ostrava |
| Contract: |
Rotterdamm, Nedherland |
| Duration: |
2011–2012 |
| Subject: |
Welding and assembly works on installation of supercritical boiler
800 MW |
| Purchaser: |
HM Ostrava |
| Contract: |
Olkiluoto, Nuclear Power Station, Fínsko |
| Duration: |
2008–2012 |
| Subject: |
Welding and assembly works on Pool Liners |
| Purchaser: |
Babcock Noell |
| Contract: |
Crescenino, Italy |
| Duration: |
1–6/2012 |
| Subject: |
Assembly of biomass boiler |
| Purchaser: |
Oschatz |
| Contract: |
Wilhelmshaven, Germany |
| Duration: |
2010–2011 |
| Subject: |
Welding and assembly works on installation of supercritical boiler
800 MW |
| Purchaser: |
HM Ostrava |
| Contract: |
Sandnes, Norway |
| Duration: |
2011–2012 |
| Subject: |
Welding and assembly works on piping system |
| Purchaser: |
VIFLOW |
| Contract: |
Landskorna, Sweden |
| Duration: |
2011–2012 |
| Subject: |
Welding and assembly works on piping system |
| Purchaser: |
VIFLOW |
| Contract: |
Örnsköldsvik, Sweden |
| Duration: |
2011–2012 |
| Subject: |
Works on turning machines |
| Purchaser: |
VIFLOW |
| Contract: |
SES, a.s. |
| Duration: |
2010–2012 |
| Subject: |
Welding and assembly works on pressure systems |
| Purchaser: |
SES, a.s. |
| Contract: |
MCE |
| Duration: |
2006–2012 |
| Subject: |
Welding and assembly works |
| Purchaser: |
MCE Bilfinger |